Basement:
Strip out of existing shower rooms and redundant generator room.
Modernize and extend the shower and bike storage facilities.
Reception:
Strip out of existing reception area and a full refurbishment to the ground floor communal entrance.
3rd Floor Suite:
Full Cat A+ refurbishment to the floor.
5th Floor Suite
Strip out of full existing Cat B space then a full Cat A+ refurbishment to the floor.